Sunday, July 5, 2009

Ready for the backfill!

Hello everybody. Good news. All the ground works have been finished and the foundation is ready for backfilling. That will be done on Monday. Jihaaa
So what happened this week to the house. Well all of the weeping tile is covered in gravel now, including those 2 metal structures in front of the basement windows. The water main is installed. The main electrical wire is in together with the ground wire. Water meter is connected. And the gas pipe is installed. Also the black water repellent foil has been attached properly with special clips.

The apartment on the other hand is working out great. It really feels like home. Today (on a Sunday) Shaw came in to install the internet connection and the digital TV. I'm connected to the world again. ;)






2 comments: